Hot

Polyscreed PU

Polyscreed PU

4-6 mm Polyurethane based flooring system

Properties

  • Water based with a high level of mechanical, chemical and water resistance.
  • Low VOC
  • High thermal resistance
  • Non-dusting
  • High chemical resistance
  • Eco-friendly
  • Anti-microbial & seamless
  • Low maintenance
  • Easier cleanability
  • LEED compliant
  • Ideal for use in Green Building projects

Description

Polyscreed PU is a three component, chemical resistant, antimicrobial polyurethane resin flooring system. It has a hard wearing, abrasion resistant and smooth matt coloured floor finish.

TDS For Polyscreed PU

Surface preparation

The concrete surface should thoroughly be cleaned of all loosely adhering particles, laitance, dust, oil, grease, paint, etc. Remove localized weak or deteriorated concrete and replace by sound concrete and structural repair materials. After surface preparation, all loose debris and dirt should be removed by vacuum equipment.

Priming

For weak and critical substrates, use our primer- POLYPRIME W in place of scratch coat so as to get better bonding. Leave the primer to be completely dry. If the primer is left for more than 24 hours before application of POLYSCREED PU, an additional coat of primer should be applied

Mixing

Pour the entire contents of Part A and Part D (colour pigment) in a mixing pot and mix it for 15 seconds, then add Part B to this mix and keep mixing it with a heavy duty paddle mixer fitted to a high torque slow speed (300-400/rpm) drill for a minute to get a homogenous mix. Then add Part C (powder) slowly into the mixture and further mix until a uniform consistency is achieved. Part mixing is not recommended.

Application

Pour the mixture of POLYSCREED PU on the floor. Spread the mix with a notch trowel uniformly to achieve the desired thickness of 4 to 6 mm. The material is to be rolled with a spike roller to release the entrapped air from the mix. The subsequent kit should be poured on the floor within the pot life of the first kit and should be spread and joints should be matched. The floor should be spike rolled and joint should be matched by rolling on the joint. Care should be taken not to take the spike roller on the earlier kit as the setting of the earlier kit has already started and taking spike roller on it can leave roller marks on the surface

Curing & Protection

At 30ºC, foot traffic access in 8 hours, vehicular traffic in 16 hours. At 20ºC, foot traffic access in 12 hours, vehicular traffic in 24 hours. Full cure at 28 days. Please refer detailed method statement which can be requested to local sales team.